Know How to Do Home Construction Step by Step

Home Construction Step by Step

Home Construction Step by Step 1. Prepare the construction site and foundation

Before a builder lays a shovel on the ground, the local government must approve the design and make the septic system, housing, electrical work, and plumbing permits for everything from zoning and grading. Once the licenses are acquired, physical construction can begin.

Often, the task of building the site and the foundation is left to the same force, but not in the wooded lot. Using a backhoe and bulldozer, the sailor clears the rocks, debris, and trees for the crumb house, and a septic system if applicable. The crew keeps the level of the site, puts the wooden form to lay the foundation, and digs holes and trenches. Footings are installed. If there is a well in your house, it will be dug in this place.

If the house has an entire basement, a hole will be dug, the feet made and poured, and the foundation walls made and poured. If it is slab-on-grade, the footings are dug, prepared, and poured; The area between them is flat and equipped with utilities and the slab is poured.

Once the concrete is poured into the hole and trench, it will take time to heal. During this period, there will be no activity on the construction site.

After the concrete has healed, the sailors install waterproofing curtains on the foundation walls; Drains, gutters, water pipes, and any plumbing that needs to go into the first-floor slab or basement floor, and the backfill dug a hole around the footwall.

Home Construction Step by Step 2. Complete rough framing

Floor systems, walls, and roof systems are complete. The plywood or oriented strand board sheath is applied to the exterior walls and the roof and windows and exterior doors are installed. The sheath is then covered with a protective covering known as a house wrap, which prevents liquid water from infiltrating the structure while allowing water vapor to escape. This reduces the chances of mold and wood rotting.

Home Construction Step by Step 3. Complete Rough Plumbing, Electrical HVAC

Once the shell is finished the siding and roof can be installed. At the same time, electrical and plumbing contractors begin to run pipes and wires through interior walls, ceilings, and floors. Sewer lines and vents as well as water supply lines are installed for each item. The place has a bathtub and a one-piece shower/tub unit as there is more space for large, bulky items.

Ductwork is installed for heating, ventilation, and air conditioning systems and possibly furnaces. HVAC vent pipes are installed through the roof and insulation is installed on floors, walls, and ceilings.

Once the roofing is turned on, the house is considered “dry”. An electrician then runs the wires for each eclipse through outlets, lamps and switches, and breaker panels. This work includes wiring for telephone, cable TV, and music systems.

Home Construction Step by Step 4. Install insulation

Insulation plays an important role in creating a more comfortable, harmonious indoor climate while significantly improving the energy efficiency of the home. The most important quality of insulation is its thermal efficiency or R-value, which indicates how much the material resists heat transfer. Most homes have attics in all exterior walls as well as attics and any floors that are incompletely located above the basement or crawl space.

The most common types of insulation used in new homes are fiberglass, cellulose, and foam. Depending on the region and climate, your builder may also use mineral wool concrete blocks, foam boards or rigid foam, insulated concrete form, sprayed foam, and structural insulated panels (SIP).

Blanket insulation, which comes in batches or rolls, is typical in new-home construction. There is loose-fill and blown insulation, which is made of fiberglass, cellulose, or mineral-wool particles. Another insulation option, liquid foam, can be sprayed, spot-foam-in, injected, or poured. If it costs more than conventional bat insulation, the liquid foam has twice the R-value per inch and can fill the smallest cavities, creating an effective air barrier.

Fiberglass and mineral-wool bats and rolls are usually installed in side walls, attics, floors, crawl spaces, cathedral ceilings, and basements. Manufacturers always attach faces such as kraft paper or foil-kraft paper to act as a vapor barrier and/or air barrier. In areas where insulation will be left open, such as basement walls, bats sometimes have a specific flame-resistant face.

Home Construction Step by Step 5. Complete drywall and interior fixtures, start exterior finish

The drywall is hung and taped so that the seams between the boards are not visible and the drywall texture is complete. A primer coat of paint is also applied after the tapping is complete. Contractors began installing exterior finishes such as brick, stucco, stone, and siding.

Home Construction Step by Step 6. Finish the interior trim, install the exterior walkways and driveway

Interior doors, baseboards, door panels, window sills, moldings, banisters, and other decorative panels, as well as cabinets, vanities, and fireplace panels and linings, are installed. Walls are painted and, if necessary, wallpapered.

Generally, outer driveways, walkways, and terraces are formed during this phase. Many home builders prefer to wait until the end of the project before pouring the driveway as heavy equipment can damage concrete. However, some builders pour the driveway once the foundation is in place so homeowners don’t get their shoes muddy when visiting the construction site.

Home Construction Step by Step 7. Install hard surface floors, countertops, and a full exterior rating

Ceramic tiles, vinyl, and wood floors and countertops are installed. The grading of the exterior coating will be completed to ensure proper drainage of the house and to prepare the garden for landscaping.

Home Construction Step by Step 8. Finishing mechanical fairings and Install bathroom fixtures

Lights, sockets, and switches are installed and the switchboard is completed. HVAC equipment is installed and registers are filled out. Sinks, toilets, and taps are available.

Home Construction Step by Step 9. Install mirrors, shower doors, finished flooring, and exterior design

Mirrors, shower doors, and carpeting are installed and the final cleaning is done. Trees, bushes, and grass are planted and other outdoor landscapes are completed.

Home Construction Step by Step 10. Last round

Your builder will guide you through your new home to familiarize you with the features and operation of various systems and components, and to explain your responsibilities for servicing and maintenance, as well as warranty coverage and procedures. This is often referred to as the pre-settlement passage. It is also an opportunity to identify items that need to be corrected or adjusted. So be attentive and alert. Examine the surfaces of countertops, faucets, floors, and walls for possible damage. Sometimes disputes arise because the homeowner discovers a furrow in a countertop after moving in and cannot prove whether it was caused by the builder’s crew or the homeowner’s moving company.